Here’s a thought: Build Expo Phase II First

In a previous post, I made a passing comment about how planning for the Expo specifically and rail transit through the Westside in general has been terribly distorted by a single-minded focus on establishing a rail connection between Santa Monica and Downtown LA. As a result of this tunnel vision, Expo proponents seem to view the route between those two destinations as merely a stretch to pass through as quickly as possible. However, Expo has the potential to serve more than just two destinations and such a limited conception of the line overlooks potential advantages like linking adjacent communities and creating a multi-directional, multi-destination transit network.

In brainstorming alternate alignments for the Westside Regional Connector, I struck upon a radical idea to recast the Expo's role in a future transit system. From the Expo line to the Purple Line to the Crenshaw/Prairie corridor, regional connectivity constantly seems to be an afterthought to Metro's rail proposals (when it is thought of at all). The Downtown Regional Connector is a prime example of this kind of backwards approach. With Fix Expo now lawyering up to argue their case regarding what they believe to be negligent and poor design of the South LA segment, Expo may need to come up with a contingency plan to salvage the project if the court case derails Phase I. So how about if we just start with Phase II in combination with the Pink Line and Westwood Regional Connector? Let’s build the Westside System from the center outward rather than getting bogged down with contentious radials like the South LA segment. Such a strategy would:

1) Allow resources to be devoted to establishing a robust core infrastructure.

2) Establish strong centrality right from the start of the project rather than forcing us to retroactively build it into the system, as is now being done with the Downtown Regional Connector.

3) Prime land in the core for transit-oriented development with maximum connectivity and give a head start to real estate in the core to develop and mature.



4) Build support both from within (i.e. for extension outward from communities directly served by the line) and from without (i.e. for connection into the system from communities not directly served)

5) Reduce traffic by improving first local mobility, then regional mobility once the connection with Downtown has been established.

6) Allow time to review the design, build consensus, and secure any additional funding should it be determined that revisions to the South LA segment are deemed necessary.



Current plans for the Expo place way too much emphasis on connecting Santa Monica and Downtown. A true transit network will need to serve more than just those two destinations and its Westside hub should be Westwood. Perhaps we should build outward from the Westwood core rather than getting bogged down on radial routes like the South LA segment.

Monday, March 24, 2008

And yes, Ladies & Gentlemen, I do take requests!

UPDATE BELOW 10:10am, 3/25/08:

So I was mulling over some comments at work today and I came up with this routing idea:

Initial Build Out:



The Pink Line, after entering the Westwood Regional Connector at Westwood/Santa Monica, would go south under Westwood to the Westside Pavillion, then west under Pico to Sepulveda, where it would join the Expo en route to Santa Monica.

Initial Build-Out Tunnel Schematic:



The Purple line would initially be built only to Wilshire/Westwood, with the final segment to Santa Monica to be built later. Until that sement is completed, the Pink Line would complete the final leg of the route from Downtown to Santa Monica.

Full Build-Out:



UPDATE:

The Exposition Construction Authority is holding community workshops [PDF] over the next week to provide information and updates on the project. I'll be going to advocate for the Venice/Sepulveda alignment, coordination with the future Pink Line, and the creation of the Westwood Regional Connector. Dates and locations are as follows:

Wednesday, March 26
6:30 to 8:30 pm
Webster Middle School
“Daniel’s Den”
11330 W. Graham Place
Los Angeles, CA 90064

Tuesday, April 1
6:30 to 8:30 pm
Crossroads School
Roth Hall
1714 21st Street
Santa Monica, CA 90404

Thursday, April 3
6:30 to 8:30 pm
Vista Del Mar Child
and Family Services
Gymnasium
3200 Motor Avenue
Los Angeles, CA 90034

Tuesday, March 11, 2008

Three Hub Plan for Initial Metro Extension

I’ve written a lot in recent posts about LA's lack of a guiding plan that would determine its priorities in constructing a transit system. I’ve also posted my evolving ideas for a large scale, integrated, and comprehensive system elsewhere (and ad nauseum) on this blog. Here I'll focus on what I believe to be the first steps in the long range plan to build a decent transit network.



First and foremost, LA needs designate Downtown, Hollywood, and Westwood as transit hubs that will act as high traffic, high capacity regional connectors for future lines that will radiate from them. The concept of a poly-centric city connected by freeways or trains is not workable. LA must strategically select hubs to recentralize around and build its transit system outward from them.



The reasoning for these specific transit hubs are as follows:

1) Downtown: Despite LA’s reputation for decentralized sprawl, Downtown maintains a strong centralized orientation that should be reinforced. However, the core remains highly under-utilized even though it is surrounded in all directions by the highest density neighborhoods in LA. Downtown is also the dominant regional hub with Metrolink providing direct access to and from the LA Basin, the San Fernando and San Gabriel Valleys, and Orange and San Diego Counties. These are strengths that must be built upon (see the Regional Connector).

2) Hollywood: Nestled at the mouth of the Cahuenga Pass, Hollywood is an established gateway to the eastern San Fernando Valley. Currently this gateway is choked with traffic which funnels through the pass, pours into surface streets, and, suppresses Hollywood’s pent-up development potential. A transit hub at Hollywood and Highland would collect traffic from the valley and distribute it through out the central area via a variety of lines radiating east, west, and south. It would also provide much needed internal mobility for its dense and transit-oriented population.

3) Westwood: Westwood sits at the mouth of the Sepulveda Pass through which squeezes all the car traffic between the San Fernando Valley and the Westside and LAX. Additionally, the 405 acts as a wall restricting east-west traffic. Like Hollywood, much of this traffic could be consolidated and collected at a transit hub and distributed throughout the Westside. Given the Westside’s greater decentralization and lower-densities, heavy-rail (i.e. the “Subway to the Sea”) would not be appropriate. Instead, a network of BRT or LRT would be better suited until ridership and the Westwood hub are more firmly established.

In addition to these three hubs, Wilshire Boulevard constitutes another dense concentration of jobs and population and would provide significant points of transfer, particularly for traffic from South LA. However, with no trains originating or terminating here and with no single point of convergence, Wilshire acts more as a corridor than as a hub. The Purple Line is as a single-line, but acts like two radial sections attached end to end: the eastern half radiates from downtown to Hancock Park via Westlake and Koreatown while the western half radiates from Westwood and Century City to Miracle Mile via Beverly Hills. The Purple is bookended by Westwood and Downtown, creating a strong bi-directional orientation that will boost ridership.

The following Westside projects would provide immediate benefits but also strategically lay the groundwork for future expansion:

Priority #1: Extend Purple Line to Westwood and construct a multi-modal “Westwood Connector”* (i.e. an underground transit facility that serves as a hub for regional transit).

Priority #2: Build a “Hollywood Connector”* and a Pink Light Rail Line from Hollywood/Highland to Santa Monica via Santa Monica and Wilshire Boulevards. The Pink line will run under Santa Monica Boulevard from the Hollywood Connector to La Cienega. West of La Cienega, it will run at grade in separate center lanes (similar to the new 3rd Street line in San Francisco). It will stop only at traffic lights until it reaches Beverly Hills, where it will utilize the existing right-of-way. It will enter a tunnel east of Beverly Hills City Hall and emerge from it west of Wilshire Boulevard. It will travel at grade for the remainder of Santa Monica Boulevard until it enters the Westwood Connector. It will exit the Westwood Connector at Wilshire Boulevard and travel to downtown Santa Monica, though I have not hashed out any ideas regarding grade separation at the moment.

Priority #3: Complete Phase II of Expo Line along Venice and Sepulveda Boulevards through the Westwood Connector to UCLA Campus.

*Regional connectors should be built with excess capacity (preferably four tracks)

These three lines, forming the core of this system and closing the circuit of transit hubs, would look like this (Downtown Regional Connector not shown):