Showing posts with label Local vs. Regional Transit. Show all posts
Showing posts with label Local vs. Regional Transit. Show all posts

Tuesday, June 17, 2008

Foothill Extension: bad for the San Gabriel Valley and bad for Los Angeles

Look, no one’s denying that the Eastside needs effective local and regional transit to compete within the LA region. And the LA region in turn depends upon a mobile San Gabriel Valley to stay globally competitive. So neither the San Gabriel Valley nor the LA Region can afford to base vital long-term transit decisions on short-sighted politics and false promises. What we build today will determine whether our metropolis emerges as a truly 21st century city or if it falls behind as a result of its own poor choices.

The Foothill Extension is a very bad choice, for both the San Gabriel Valley and Los Angeles as a metropolis. The Board of Supervisors should oppose funding for it, regardless of the consequences. Not only will the line be a white elephant that drains current and future transit resources, it will also undermine current transit infrastructure, distort future development and transit expansion, and commit the region to a continuance of the same development fueled decentralization that is choking California. Sprawl is sprawl, whether induced by rubber or rail.

What little centralization of population, jobs, development, and transit infrastructure that currently exists in the San Gabriel Valley is concentrated along the 10 corridor. This corridor is served by the San Bernardino Freeway, the San Bernardino Metrolink, and the El Monte Busway. El Monte and West Covina are the dominant transit, commercial, and business centers along this corridor. Both are centrally located cities with populations exceeding 100,000 that would be natural foci for intensified land-use and transit-oriented development.

In contrast, the Foothill extension would skirt most of the central commercial areas along its route, traveling instead through industrial back areas and at times even large swaths of open land. Predictably though, this is all being pitched as somehow being an advantage:

Advocates for the line also point to the abundant amount of land available for development near the tracks, saying that most of the growth in the San Gabriel Valley in coming decades could be put near mass transit -- not the usual way of doing things in Southern California, at least in the past.

This line would be entirely dependent upon creating even more wonderful new communities where none existed before, in turn creating new traffic needs with even fewer options. The Foothill line could be of limited use (i.e. a quick commute to Downtown) to the few people who can afford to live near the new stations and work in Downtown LA, but otherwise it would be pretty much useless for the rest of the Valley’s residents who need more transit options than just a half-assed commuter train in the far reaches of the foothills. Faced with this single, limited option, most residents would continue to depend upon their cars to get around.

The Foothill extension would also open up even more land for development precisely when LA must confront its geographical overstretch and its related over-commitment in terms of infrastructure. The imperative now is to consolidate our infrastructure and invest inward, not open up new tracts of land and continue building relentlessly outward.

Whatever success the line happened to achieve would ultimately come at the expense of existing communities and the region as a whole, by drawing infrastructure away from and undermining the centrality of the established 210 corridor, replacing a single strong regional corridor with two significantly weaker and under-performing corridors. In creating a redundant and ineffectual regional link to Downtown, the Foothill extension would be a drain on future transit resource for the San Gabriel Valley.

My Proposed Compromise: Expo to Alhambra and Busway upgrades

Extending the Expo eastward to Alhambra would bring numerous benefits.

  • It would give the Western San Gabriel Valley a direct connection to Downtown and the Westside.
  • It would make Alhambra a magnet for smart urban development while re-establishing the city's position as a 1st generation suburban city adjacent to LA (a la Pasadena and Glendale).
  • It would also give San Gabriel Valley a stake in seeing the full Expo line completed, from Alhambra, through Lincoln Heights and Downtown, past Dorsey High, through Cheviot Hills, to downtown Santa Monica. (A Westwood spur would only sweeten the appeal further)
  • Symbolically, this would make the Expo a truly trans-regional project. While building this line, we can also be building confidence, cooperation, and maybe even a little consensus. This could be a project we work on together as a metropolis.
Improvements to and the extension of the El Monte Busway would bolster the regional connections between Downtown and the Outer Valley, while upgrades and service improvements to the existing transit infrastructure would improve the latter’s local connectivity.

Improvements to the El Monte Busway include:
  • Its Extension to The Plaza and The Eastland Center in West Covina
  • Creation of Monterey Park Station
  • Increased frequency of service
  • Study of possible conversion to rail
  • Bolstering of local transit networks serving regional stations

Tuesday, June 10, 2008

The Eastside's Three Transit Zones

Expo to Alhambra



The Alhambra branch of the Expo will use the same track as the Gold Line to Sierra Madre and the new Glendale line. North of Chinatown it will branch east across the river and run along North Broadway, the main commercial thoroughfare of Lincoln Heights. The Expo would directly link this neighborhood to Downtown Los Angeles and beyond, revitalizing this historic district and weaving back together the urban fabric that was ripped apart by the Golden State Freeway.

The Expo would then continue to Huntington via Mission and arch gracefully through the Foothills up to Alhambra, one of LA’s first-rung suburbs. Huntington Drive is wide enough to accommodate a light-rail, which has the potential to break up some of the route's vast expanses of concrete and transform it into an elegant transit corridor. The Expo would turn off of Huntington and onto Main, avoiding both South Pasadena and San Marina and heading straight downtown Alhambra’s main commercial thoroughfare. Buses would continue serving the Huntington Drive corridor to the north.

The Alhambra station at Main and Atlantic would provide a portal to Downtown and the Westside and act as a gateway between Downtown and the Inner San Gabriel Valley. Alhambra’s compact and walkable layout, it’s proximity to Downtown LA, and its link to the rest of the metropolis via the Expo line would make it ideal for higher density, transit-oriented development.

Inner (Western) San Gabriel Valley:



The San Gabriel River, the Santa Fe Dam Recreational area, and the predominately industrial city of Irwindale divide the San Gabriel Valley into eastern and western halves. The western half includes the cities of Pasadena, South Pasadena, Alhambra, Monterey Park, San Marino, San Gabriel, Rosemead, Arcadia, Temple City, Sierra Madre, Monrovia, Bradbury, Duarte, El Monte, and South El Monte. This subregion is linked by rail to Downtown Los Angeles via stations on the Gold line, the Expo line, the El Monte Busway, and the San Bernardino Metrolink. Metro provides most of the bus service for this area. Pasadena, Alhambra, and El Monte are the dominant transit centers of the Inner Valley, with the latter acting as the main link between the east and west sides of the Valley.

Outer (Eastern) San Gabriel Valley:



The Eastern San Gabriel Valley includes the cities of Azusa, Irwindale, Baldwin Park, Glendora, Covina, West Covina, La Puente, City of Industry, San Dimas, La Verne, and Walnut. Foothill Transit provides the bulk of bus service for the area, while the San Bernardino and the Riverside Metrolink trains connect the Outer Valley to Downtown LA. There are also two major transit hubs - the Plaza at West Covina and the Eastland Center - that feed buses onto the adjacent San Bernardino Freeway and into the busway at El Monte. West Covina, Baldwin Park, and (to a lesser extent) Covina are the dominant transit hubs for this subregion.

Monday, April 14, 2008

Here’s a thought: Build Expo Phase II First

In a previous post, I made a passing comment about how planning for the Expo specifically and rail transit through the Westside in general has been terribly distorted by a single-minded focus on establishing a rail connection between Santa Monica and Downtown LA. As a result of this tunnel vision, Expo proponents seem to view the route between those two destinations as merely a stretch to pass through as quickly as possible. However, Expo has the potential to serve more than just two destinations and such a limited conception of the line overlooks potential advantages like linking adjacent communities and creating a multi-directional, multi-destination transit network.

In brainstorming alternate alignments for the Westside Regional Connector, I struck upon a radical idea to recast the Expo's role in a future transit system. From the Expo line to the Purple Line to the Crenshaw/Prairie corridor, regional connectivity constantly seems to be an afterthought to Metro's rail proposals (when it is thought of at all). The Downtown Regional Connector is a prime example of this kind of backwards approach. With Fix Expo now lawyering up to argue their case regarding what they believe to be negligent and poor design of the South LA segment, Expo may need to come up with a contingency plan to salvage the project if the court case derails Phase I. So how about if we just start with Phase II in combination with the Pink Line and Westwood Regional Connector? Let’s build the Westside System from the center outward rather than getting bogged down with contentious radials like the South LA segment. Such a strategy would:

1) Allow resources to be devoted to establishing a robust core infrastructure.

2) Establish strong centrality right from the start of the project rather than forcing us to retroactively build it into the system, as is now being done with the Downtown Regional Connector.

3) Prime land in the core for transit-oriented development with maximum connectivity and give a head start to real estate in the core to develop and mature.



4) Build support both from within (i.e. for extension outward from communities directly served by the line) and from without (i.e. for connection into the system from communities not directly served)

5) Reduce traffic by improving first local mobility, then regional mobility once the connection with Downtown has been established.

6) Allow time to review the design, build consensus, and secure any additional funding should it be determined that revisions to the South LA segment are deemed necessary.



Current plans for the Expo place way too much emphasis on connecting Santa Monica and Downtown. A true transit network will need to serve more than just those two destinations and its Westside hub should be Westwood. Perhaps we should build outward from the Westwood core rather than getting bogged down on radial routes like the South LA segment.

Sunday, March 23, 2008

We Get Mail (3/23/08)

I was hoping to post my explanation of the Hollywood Regional Connector and the Hollywood system, but instead ended up developing my Westside proposal a little more. Hopefully I can have the Hollywood system for you soon. Instead, a few response to comments:

(1) A few readers contested what they saw as my assertion that the Westside could not support heavy rail. I can see how they construed this from what I wrote, so allow me to clarify. In terms of the Purple line extension, we need to get away from the name “Subway to the Sea” as it reinforces the expectation of a heavy rail line to Santa Monica. Considering (a) the Westside’s lower densities in comparison with the rest of the Wilshire Corridor, (b) the broad dispersion of and multiple destinations within those densities, and (c) Santa Monica’s location off the Sepulveda/LAX axis, a subway all the way to Santa Monica would not be the most effective use of valuable transit funds. Those funds should be devoted to establishing connectivity throughout central LA by creating the Westwood Regional Connector, the Hollywood Regional Connector, and the Pink Light Rail line from Hollywood/Highland to Westwood. The Westside has the density to justify the cost of a single heavy rail line directly serving a single destination on the Westside. However, a more effective use of transit resources would be a network of light rail lines serving the multiple dispersed destinations throughout the Westside.

Downtown Santa Monica:



(2) Based upon the objections to my Expo proposal, I decided to drive along both alignments today and get a better feel for the area. As far as the route from West L.A. to Santa Monica, I've changed my mind. The Expo right of way should stay that course, though it should go along Colorado past 17th. It was a tough call because Pico is a nice commercial corridor to about Cloverdale, but the directness of and business concentration (however suburban in form) along the original route tips the choice in favor of the original alignment. (contingent upon that Colorado alignment. Continuing it along Olympic west of 17th would be pointless.)

(3) I stand by the Venice/Sepulveda alignment though. Neighborhoods along Venice Boulevard would be given a unifying transit and commercial orientation while the Sepulveda segment (going from up to Pico, then rejoining the Expo ROW to the west) would establish the southern half of the Westwood Regional Connector. In contrast, the existing right of way between Robertson and Sepulveda goes predominately through residential areas with no the logical focus of stations or development comparable to Venice Boulevard. It also does nothing to establish infrastructure that can elaborated upon later in its life. My proposal accomplishes the immediate goals for this project while leaving the door open for future expansion.

Initial Build Out:



Full Build Out:



(4) Commentator Allen also made to following comment that I feel deserves special consideration:

John’s ideas seam to be taking valuable traffic lanes in almost all of his “designs” which is not necessarily the best way to go.

When possible keep the lines away from traffic and roads, but have the stations at where they can be the most convenient for hubs and transfers as well as walk able to the greatest needs.
This sentiment really goes to the heart of what our goals should be in developing a transit system for LA. Any effective system for this city will inevitably compete and come into conflict with automobile traffic. But as Gerald at Baltimore Innerspace explains:
Most people do not use transit because they want to. They use transit because they need to. Most New Yorkers and Londoners would not use their local subways if they had easy highway access to work and subsidized free parking. They would become like Baltimoreans and stay in their cars.
Transit development is a process of carrots and sticks. In compulsively avoiding the “stick” (demanding auto-traffic to accommodate and yield to localized mass transit, demanding the investment), we forfeit any “carrots” public transit may offer (pedestrian orientation, spatial economy, potential to revitalize urban space). The Expo line perfectly illustrates this. The Palms ROW alignment seems logical only on the basis of short-term goals of avoiding "sticks" and serving a rapid regional function mainly for Downtown and Santa Monica. In contrast, the Venice/Sepulveda alignment follows a surface routes where businesses and pedestrians are actually located, giving it a greater local function. As a local line with destinations closer together, Metro would not need to worry about maintaining the speeds a regional line requires to be effective.

There is no doubt LA is in the midst of a transit crisis and immediate measures must be taken to extricate ourselves from it. However, we must not allow the need for short-term solutions to eclipse long-term strategy. Our current crisis has been years in the making and our solution to it will be also. There is no magic bullet train.