Showing posts with label Transit Hubs. Show all posts
Showing posts with label Transit Hubs. Show all posts

Sunday, August 3, 2008

Transit and sustainable growth strategy

I'll try to compose some responses to the comments on my last post, but I got kinda sidetracked on this post.

With the rail plans I am proposing here, I'm looking address not just existing transit problems but also the underlying land use and development strategies that have brought us to this point. An effective transit plan needs to be part of a broader growth strategy and provide a framework for the region's future development patterns.

This is what makes our current transit/development crisis such a watershed moment. LA's present development strategy of sprawling, low-density, decentralized development was premised upon abundant land and resources and cheap gasoline. But those fundamental underpinnings are now gone and LA must now radically reverse that previous strategy. Instead of uncontrolled outward expansion, employment, housing, and transit infrastructure should be funneled inward into a hierarchy of existing, currently underutilized urban cores. The hierarchy of urban cores is as follows:

Primary Central Business District:

There is no greater symbol of Southern California's deep seated anti-urbanism than LA’s notoriously degraded and neglected downtown. If the LA region intends to survive and compete in the 21st century, it must overcome this antipathy and make full use one of its most valuable assets. Speaking solely in terms of location, Downtown is the most centralized CBD in Southern California. Strengthening Downtown’s centrality and optimizing its accessibility must be the cornerstone of LA county’s growth and transit strategies.
  • Downtown


Secondary Central Business/Transit Districts:

After Downtown, the LA region’s economic center of gravity pulls decidedly westward as well as northward towards the inner reaches of the San Fernando Valley. Every day, thousands of commuters jam the streets and freeways to get to jobs in these areas. A series of secondary hubs would (a) form a transit web to carry commuters to their jobs in these areas which in turn would (b) allow higher residential densities and higher intensity land-use, enabling commuters to live closer to their jobs.
  • Westwood


  • North Hollywood


  • Hollywood


  • Wilshire


  • West Adams


Tertiary Hubs:

Due to their geographic distances and/or their off-center locations, tertiary hubs generally lack the geographic reach and connectivity of primary and secondary hubs. Basically, fewer lines converge on these hubs, reducing their regional accessibility. Tertiary hubs fall into two categories:

(a) Satellite employment centers. Off-center employment centers are less directly accessible from the larger region and therefore may require additional transfers. As a result, commuters may find it easier to live closer to their jobs here than they would if they worked in a primary or secondary hub. However, tertiary hubs bookend many transit lines, encouraging reverse commutes and bi-directional usage along these routes. Increased centralization around tertiary hubs could house workers and anchor local bus service.
  • Santa Monica/Culver City (Nearest Hub(s): Westwood & Downtown; Local Bus: BBB, Culver City Bus, MTA)
  • LAX (West Adams; MTA, BBB, Culver City Bus) NOTE: LAX could be developed into a secondary hub, but only after the current proposed network is firmly established
  • Burbank/Sherman Oaks/Warner Center (North Hollywood; MTA, Burbank Bus)
  • Glendale/Pasadena (Downtown & North Hollywood; MTA, Glendale Beeline)
  • West Covina (Downtown; Foothill Transit)
  • Long Beach (Downtown; Long Beach Transit, Torrance Transit, MTA)

(b) Residential reservoirs and suburban collection points. With their lower densities and peripheral locations, tertiary residential communities can't support extensive fixed rail networks. Instead, rail would connect these communities to the primary and secondary (or tertiary in the case of the outer SGV) CBDs, while beefed-up bus service would provide connectivity and internal circulation. At the same time, rail stations provide anchors for local commercial districts, which would become secondary downtowns for the surrounding communities.
  • Alhambra/Temple City (Downtown; MTA)
  • El Monte (Downtown; MTA & Foothill Transit)
  • Azusa/Glendora/Covina/La Puente/Industry/Hacienda Heights (West Covina; Foothill Transit)
  • Chatsworth/Canoga Park/Reseda/San Fernando/Pacoima/Panorama City (North Hollywood; MTA)
  • Huntington Park/Watts (Downtown; MTA)
  • Torrance (West Adams; Torrance Transit, Beach Cities Transit, MTA)

Sunday, June 15, 2008

The San Fernando Valley Subsystem



I’d like to put in an additional two of my cents in reference to Steve Hyman’s excellent post on the Foothill extension over at Bottleneck Blog.

But first, I would like to present my proposal for the San Fernando Valley subsystem.

The San Fernando Valley Subsystem’s main transit corridor extends the existing Orange Line from Van Nuys to Burbank via North Hollywood, connecting the Subsystem’s trio of major transit hubs.

In addition to these three hubs, Sherman Oaks serves as a secondary hub, acting as the gateway station for traffic between the Valley and the Westside. To that end, the Sherman Oaks line is aligned to the mouth of the Sepulveda pass to accommodate any future direct link between the Valley and the Westside.

Burbank

Burbank is the eastern terminus for the Warner Center (Orange) and the San Fernando-Pacoima (Yellow) lines. It is also the gateway station for the Intervalley Line (Purple) between Sherman Oaks and Pasadena.

Of the Subsystem’s three major hub stations, Burbank is the only one directly served by Metrolink: the Ventura County Line and the Antelope Valley Line. A streetcar (Olive Green) along Olive Ave./Riverside Drive connects Burbank to Universal City and Toluca Lake. Burbank connects to Bob Hope Airport directly via Metrolink and with one transfer to a streetcar (Light Blue) at the Chandler/Hollywood Way station.

North Hollywood

As the terminus of the Red Line, North Hollywood is the Subsystem’s portal station for traffic between the Valley and the LA Basin. Almost all Basin-bound traffic will pass through North Hollywood station. Arriving Valley-bound travelers will have a number of travel options.

Destinations directly served by light rail include:

  • Van Nuys, Burbank (Purple, Orange, Yellow)
  • Sherman Oaks (Purple)
  • Reseda, Warner Center (Orange)
  • Panorama City, Pacoima, and San Fernando (Yellow)

Destinations directly served by streetcar:

  • Magnolia Park, Bob Hope Airport (Light Blue)
  • Toluka Lake, Olive Ave: (Olive Green)
  • Studio City, Sherman Oaks, Ventura Boulevard (Pink)

Van Nuys

Van Nuys is the Subsystem’s true crossroads, the portal between inner and outer San Fernando Valley where all the light rail lines converge from all directions. Van Nuys also connects to Ventura Boulevard, Studio City, and Universal City via streetcar (Pink).

According to Wiki, Van Nuys “functions similar to a ‘county seat’ for the Valley, with its Government Center (Erwin Street Mall) containing a branch of the Los Angeles County Superior Court, Van Nuys police station, the Van Nuys offices for Los Angeles City Hall, Van Nuys State Office Building and a branch of the Los Angeles Public Library.”

Tuesday, April 8, 2008

Density Without Recentralization Will Fail

Density seems to be becoming the political battleground in LA right now, but in the process I think people are missing the larger imperative. If LA really intends to confront the structural causes of the massive problems it faces, it is going to have to radically reverse the policies of decentralization it has pursued throughout almost its entire history. This represents an even more profound challenge considering how such reversals cut to the heart of Los Angeles’ identity and of the entire California Dream.

The pursuit of density for density’s sake will come to nothing if it is not accompanied by such a strategy of recentralization. It's helpful to consider that it was the Bradley administration’s eighties pro-growth excesses (now potentially being replayed by Antonio Villaraigosa) that provoked Proposition U and spawned the anti-development crusade that Zev Yaroslavsky continues to champion to this day. In this light, the current economic slowdown and mortgage crisis could actually offer LA the opportunity to slow-down, restructure, recentralize, and come back a leaner, meaner and smartly densified city. But that of course depends on whether LA is willing to truly break with the unsustainable policies and strategies of the past.

LA has three logical cores to direct recentralization into: Downtown, Hollywood, and Westwood. Jobs, housing, and transit infrastructure should be diverted from the newer, lower density periphery areas and into these cores. This is called investing in what you already have.



Decentralized jobs in Los Angeles are currently scattered throughout the region. The strategy of job decentralization was originally premised upon the idea that it would bring jobs closer to suburban workers. In reality, it brought jobs closer to a select handful of suburban residents (who most often worked elsewhere) while placing those same jobs out of reach for the remainder of the region’s workers. Recentralized job concentrations would make jobs accessible to the largest number of workers possible, rather than to a few at the expense of the many.

Decentralized housing in Los Angeles currently sprawls miles from the three cores and their infrastructure. Low density residential use at the center hogs space and squanders the region’s valuable, limited resource of center-city land. Underutilized central land also drives up housing costs and creates housing pressure that is displaced in two ways: outward toward ever greater sprawl and inward into the limited, increasingly overcrowded and deteriorating multi-family housing stock. Increasing residential density coupled with recentralization would redirect market pressure towards the core where land is more valuable and help alleviate sprawl and overcrowding.

Decentralized transit in Los Angeles is currently stuck in a losing game of chasing after decentralized riders to take them to decentralized jobs and other decentralized destinations. But which decentralized riders should be taken to which decentralized location? And how do you collect millions of scattered people going in different directions into a single transit line, much less an integrated transit system? Recentralization of housing and employment would create distinct commercial concentrations surrounded by high density residential zones that could be logically and effectively served by public transit.

UPDATE: This Wired article succinctly summarizes the decentralization that lies at the heart of LA's transit problems:

Los Angeles' urban planning doesn't help either, as its low-density sprawl makes it difficult to provide rapid transit service to every part of the city. In addition, because areas are so spread out, riders are sometimes required to drive to a kiss-and-ride lot to take the train; many, however, once in the car, just decide to continue driving. Finally, there are only 446,000 jobs in downtown Los Angeles, meaning that the other 4.4 million employed in the county work in other areas outside this so called "central business area." Commutes, therefore, do not form in a traditional downtown/outbound pattern to and from a single, dense, central location - the patterns tend to be a bit more random. Not every destination will be able to have an easy connection to a rail line. Commutes may need more than two transfer to complete the journey.


(h/t Streetsblog)

Tuesday, March 11, 2008

Three Hub Plan for Initial Metro Extension

I’ve written a lot in recent posts about LA's lack of a guiding plan that would determine its priorities in constructing a transit system. I’ve also posted my evolving ideas for a large scale, integrated, and comprehensive system elsewhere (and ad nauseum) on this blog. Here I'll focus on what I believe to be the first steps in the long range plan to build a decent transit network.



First and foremost, LA needs designate Downtown, Hollywood, and Westwood as transit hubs that will act as high traffic, high capacity regional connectors for future lines that will radiate from them. The concept of a poly-centric city connected by freeways or trains is not workable. LA must strategically select hubs to recentralize around and build its transit system outward from them.



The reasoning for these specific transit hubs are as follows:

1) Downtown: Despite LA’s reputation for decentralized sprawl, Downtown maintains a strong centralized orientation that should be reinforced. However, the core remains highly under-utilized even though it is surrounded in all directions by the highest density neighborhoods in LA. Downtown is also the dominant regional hub with Metrolink providing direct access to and from the LA Basin, the San Fernando and San Gabriel Valleys, and Orange and San Diego Counties. These are strengths that must be built upon (see the Regional Connector).

2) Hollywood: Nestled at the mouth of the Cahuenga Pass, Hollywood is an established gateway to the eastern San Fernando Valley. Currently this gateway is choked with traffic which funnels through the pass, pours into surface streets, and, suppresses Hollywood’s pent-up development potential. A transit hub at Hollywood and Highland would collect traffic from the valley and distribute it through out the central area via a variety of lines radiating east, west, and south. It would also provide much needed internal mobility for its dense and transit-oriented population.

3) Westwood: Westwood sits at the mouth of the Sepulveda Pass through which squeezes all the car traffic between the San Fernando Valley and the Westside and LAX. Additionally, the 405 acts as a wall restricting east-west traffic. Like Hollywood, much of this traffic could be consolidated and collected at a transit hub and distributed throughout the Westside. Given the Westside’s greater decentralization and lower-densities, heavy-rail (i.e. the “Subway to the Sea”) would not be appropriate. Instead, a network of BRT or LRT would be better suited until ridership and the Westwood hub are more firmly established.

In addition to these three hubs, Wilshire Boulevard constitutes another dense concentration of jobs and population and would provide significant points of transfer, particularly for traffic from South LA. However, with no trains originating or terminating here and with no single point of convergence, Wilshire acts more as a corridor than as a hub. The Purple Line is as a single-line, but acts like two radial sections attached end to end: the eastern half radiates from downtown to Hancock Park via Westlake and Koreatown while the western half radiates from Westwood and Century City to Miracle Mile via Beverly Hills. The Purple is bookended by Westwood and Downtown, creating a strong bi-directional orientation that will boost ridership.

The following Westside projects would provide immediate benefits but also strategically lay the groundwork for future expansion:

Priority #1: Extend Purple Line to Westwood and construct a multi-modal “Westwood Connector”* (i.e. an underground transit facility that serves as a hub for regional transit).

Priority #2: Build a “Hollywood Connector”* and a Pink Light Rail Line from Hollywood/Highland to Santa Monica via Santa Monica and Wilshire Boulevards. The Pink line will run under Santa Monica Boulevard from the Hollywood Connector to La Cienega. West of La Cienega, it will run at grade in separate center lanes (similar to the new 3rd Street line in San Francisco). It will stop only at traffic lights until it reaches Beverly Hills, where it will utilize the existing right-of-way. It will enter a tunnel east of Beverly Hills City Hall and emerge from it west of Wilshire Boulevard. It will travel at grade for the remainder of Santa Monica Boulevard until it enters the Westwood Connector. It will exit the Westwood Connector at Wilshire Boulevard and travel to downtown Santa Monica, though I have not hashed out any ideas regarding grade separation at the moment.

Priority #3: Complete Phase II of Expo Line along Venice and Sepulveda Boulevards through the Westwood Connector to UCLA Campus.

*Regional connectors should be built with excess capacity (preferably four tracks)

These three lines, forming the core of this system and closing the circuit of transit hubs, would look like this (Downtown Regional Connector not shown):