Showing posts with label Westside Connector. Show all posts
Showing posts with label Westside Connector. Show all posts

Sunday, March 16, 2008

Expo: Key to the Westside System

The north-south route between the Sepulveda Pass and LAX, as currently defined by the 405, form the spine of the Westside. The Westside Connector would reinforce this orientation with the Westwood/Wilshire and Westwood/Santa Monica Blvd stations acting as the primary hub stations for the entire Westside System. These stations would collect both north-south and east-west traffic, providing riders multiple options for travel throughout the Westside.



By heading along Venice, Sepulveda and Pico then into the Westwood Regional Connector as I propose, the Expo would accomplish three things: (1) define the north-south axis that forms the structure of the Westside system; (2) intercept all east and west bound traffic and orient it towards the Westwood core; and (3) establish the infrastructure that will be used for further expansion throughout the Westside.



As currently proposed, the Expo line runs roughly across the Sepulveda/LAX axis and meanders along an undeveloped right-of way far from any commercial activity or centralized residential areas. A hasty conceived alternative to the blocked Subway to the Sea, it’s quite likely to become a white elephant. However, it could be salvaged one of the following two ways:

1) Build the Westwood Regional Connector: The preferable way would be to route the line west along Venice Boulevard, north along Sepulveda, then east on Pico and through the Westwood Regional Connector to its terminus at UCLA. This would anchor the Expo at both ends with two of the systems regional hubs. Furthermore, the tracks constructed along Venice could in the future be shared by another line running from Hollywood/Highland to Venice via La Cienega. The tracks along Sepulveda could also carry two future lines traveling out of the Westwood stations: one to Venice and another shooting south to LAX.

2) Route it to Santa Monica via Pico Blvd: The less preferable option would also use the Venice/Sepulveda alignment outlined above, but would instead head west along Pico, then briefly follow the coast to downtown Santa Monica. This would provide desperately needed service to and from the Westside while also be serving local businesses, neighborhoods, and Santa Monica Community College. It would also create the infrastructure that could be used by a future line from UCLA to Santa Monica via Pico Boulevard.